Hard Rock Las Vegas Details Three New Entertainment Venues for Mirage Redevelopment
Parker Müller · Aug 17, 2026

Hard Rock Las Vegas Details Three New Entertainment Venues for Mirage Redevelopment

Hard Rock Las Vegas has outlined plans for three distinct entertainment venues as part of its redevelopment of the former Mirage property on the Las Vegas Strip, and Clark County filings show the resort is targeted to open in late 2027. The project centers on a new 2,000-seat West Theater arena, a 5,000-seat Hard Rock Live that will replace the existing Beatles Love theater, and a repurposed former Mirage Theater designed for more intimate performances. These elements appear in project documents submitted to county officials, and they reflect a deliberate strategy to create a range of show formats under one resort umbrella.
Breakdown of the Three Venues
The 2,000-seat West Theater arena forms the largest new build in the proposal, and it is positioned to host concerts, sporting events, and large-scale productions that require flexible staging. Project documents describe a modern arena layout with updated sightlines and production capabilities, while the venue's location on the west side of the property allows it to connect with surrounding retail and dining areas. Observers note that this size fills a specific niche on the Strip between smaller clubs and massive stadiums.
Hard Rock Live will take over the space currently occupied by the Beatles Love theater and expand capacity to 5,000 seats. The redesign includes upgraded acoustics, a larger stage footprint, and improved VIP seating sections, and the venue name ties directly to the Hard Rock brand's history of live music programming. County filings indicate that construction crews will gut and rebuild the interior while preserving the overall footprint to speed up the permitting process.
The third venue reuses the former Mirage Theater for smaller, more intimate shows, and plans call for seating reductions that create a club-like atmosphere suitable for comedians, acoustic sets, and boutique productions. This space keeps its central location within the resort but receives new lighting, sound systems, and flexible seating configurations that can shift between seated and standing formats depending on the event.
Development Timeline and Regulatory Path
Filings submitted to Clark County detail a construction schedule that targets a late 2027 opening, and the timeline includes phased work that begins with structural modifications to the existing theaters before the new West Theater arena rises. The approach allows parts of the property to remain active longer, and it aligns with broader redevelopment milestones already approved for the site. August 2026 marks a key checkpoint where updated engineering drawings and traffic studies are due, giving regulators time to review before major ground work accelerates.

Project documents emphasize coordination with Clark County permitting offices on safety, accessibility, and environmental standards, and the three-venue configuration appears designed to meet those requirements while maximizing event flexibility. Data in the applications show projected attendance figures that support the chosen capacities, and the filings also outline parking, loading, and emergency access routes specific to each performance space.
Integration with Resort Redevelopment
The entertainment venues sit within a larger transformation of the Mirage property into Hard Rock Las Vegas, and the filings connect the new theaters to hotel tower upgrades, expanded gaming floors, and outdoor event plazas. County records indicate that the venues will share back-of-house infrastructure such as dressing rooms and production offices, which reduces overall construction costs and streamlines operations once the resort opens. The design keeps public circulation paths separate from service corridors to maintain guest flow during peak event nights.
Plans reference connections to the Las Vegas Monorail station and nearby pedestrian bridges, and these links are intended to improve access for visitors attending shows without cars. The filings also note that the three venues can operate simultaneously on busy weekends, with staggered start times that help manage crowd movement across the property.
Conclusion
Clark County filings and project documents confirm that Hard Rock Las Vegas will deliver three distinct entertainment venues as part of the former Mirage redevelopment, with the 2,000-seat West Theater arena, the 5,000-seat Hard Rock Live, and the repurposed Mirage Theater all scheduled to be ready when the resort opens in late 2027. The plans detail specific capacities, construction sequences, and operational features that support a range of live performances under one brand. Further updates are expected as the August 2026 engineering submissions are reviewed and construction advances.